A complete Software Development Life Cycle with Agents
How a request travels from idea to production with AI agents doing the work and a person deciding at eight gates.
Only the title opens the project.
S0 Intake
A request comes in and is sorted into a run that fits its size.
S1 Requirements
The request becomes a clear, testable product requirements document. Gates: G1 PRD baseline (after this stage).
S2 Experience design
Each changed screen gets only as much design as it needs, then a prototype. Gates: G2 Design direction; G3 UX acceptance.
S3 Design and plan
Agents choose the architecture and cut the work into small slices. Gates: G4 Design and plan (after this stage).
S4 Build
Each slice is built, reviewed and security-checked before it merges. Gates: G5 Sensitive merges.
S5 Verify
The release is tested against every acceptance criterion. Gates: G6 QA sign-off (after this stage).
S6 Release
It ships to staging, then to production only after a person says go. Gates: G7 Production go / no-go.
S7 Operate
Production is watched, and what was learned feeds the next request. Gates: G8 Post-release review.